Constantine D. Memos - Consulting
 

Main Positions Held

  • 1972-74 Doxiadis Associates Inc, Civil Engineer
  • 1977-79 J.D. & D.M. Watson (Athens), Senior Engineer
  • 1980-85 Doxiadis Associates Inc, Project Manager
  • 1985-date Consultant on Port and Coastal engineering
     

Main Projects

  • 1972-74 Detailed design of surface water supply for the Kardia Power Station in northern Greece.

  • 1977-79 Planning and design of surface water drainage systems for the Greater Athens Area.

  • 1979 Preparation of infrastructure studies and designs for the University of Patras, Greece.
    Feasibility study for a marina in Corfu, Greece.
  • 1980 Planning for Greek ports and marinas within the framework of the National Development Plan and Programme.
    Design of water supply and irrigation systems for the Petromin housing scheme in Dammam, Saudi Arabia.
    Feasibility study for an industrial harbour on the island of Macronissos, Greece.
  • 1981 Study and design of utility networks for two industrial towns in Iraq.
  • 1981-83 Technical management of marine works in connection with the design and construction of a ship repair yard in Dammam, Saudi Arabia.
  • 1982 Coastal protection at Chalkis Treatment Works, Greece.
  • 1983 Water Supply of an island village, Andros, Greece.
  • 1983-85 Project management of the study: Planning and Development of Greek Ports.
  • 1985 Repair and development of an Air Base marina in Crete.
  • 1985-86 Sewerage and sea-outfall, Kokkari, Samos.
  • 1986 Development works at two fishing harbours, Aegina, Greece.
    Preliminary engineering of two coast guards harbours, Jordan.
  • 1987 Coastal works for a seaside resort at Pylos, Greece.
    Coastal protection works at Messologhi salt lagoons, Greece.
  • 1987-89 Project Manager, Design of Chania marina.
    Vathi sea outfall.
    Project Manager, Updating of the master plan of Rafina port.
  • 1988 Alexandroupolis sea outfall.Sea water intake and transfer from Patraikos Gulf to Messologhi salt plant. Technical Advisor.
  • 1990 Study of dispersion and design of coastal outlets of two streams in western Peloponnese, Greece.
  • 1991 Rehabilitation of Beira fishing harbour, Mozambique (with Doxiadis Associates)
  • 1992 Coastal touristic development including marina design, water circulation study, etc, near Jeddah, Saudi Arabia (with ACE Intl).
    Rehabilitation of inner harbour of Ag. Kyrikos, Ikaria, Greece. Technical Advisor.
    Sea outfall of Patras industrial park. Technical proposal.
  • 1993 Development of new Igoumenitsa gateway harbour.
    Maritime Recycling Centre at Astakos, Greece. Assessment of potential future operations.
    Preliminary design of offshore moorings in Kalamata Bay.
    Shoreline and harbours management for two Ionian islands.
  • 1994 Shoreline management and marina siting along Trizinia coast, NE Peloponnese.
    Mooring conditions of cable-laying ship at 5 Aegean islands.
  • 1995 Proposal for a rehabilitation of a marina in Glyfada, Attica.
    Development plan and design of Santorini port.
  • 1996 Consulting services for the mooring systems of Electric Company, Egypt: Design concept of dolphins of Power Plant, and estimation of wave forcing on an underwater intake, Sidi Krir.
    Dolphins at fuel unloading berth in Red Sea.
  • 1997 Development Plan of P. Epidauros Port.
  • 1998 Layout of watersports installations for the 2004 Olympic Games, St. Cosmas & Fhaleron Bay.
    Development Plan of Souvala Port, Aegina.
  • 1999 Environmental studies for Athinios Port, Santorini.
  • 2000 Sea outlet of river Potamos, Corfu.
    Environmental study of Lemessos marina, Cyprus.
  • 2001 Olympic Works; Phaleron Bay, Athens.
    Fishing harbour, Ziyi, Cyprus.
    Sea outfall of Agioi Theodoroi, Attica.
  • 2002 Sea outfall, Maritime Biology Institute in Crete.
    Strategic and Business Plan for Patras Port.
    Upgrading of HEPHAESTUS Shipyards, Latsis Group.
  • 2003 Investigation for the optimum coastal location of the energy industries of Lesvos Island.
    Design of imported sandy beach in front of hotel installations in Evia.
    Development of a fishing ports system in north Aegean islands.
  • 2004 Water renewal and wave penetration studies, Salman Bay, S.Arabia.
    Cooling water sea pipelines, Greek Oil, Thessaloniki.
    Wave protection of Herakleion Venetian Walls, Crete.
    Preliminary development plan for a marina at Attica's east coast.
  • 2005 Design of wave protection of a slipway in Kalymnos Island, Greece.
    Hydrodynamic Study of Durrat AlKhobar embayment, S.Arabia.
    Wave protection of storm outfalls near Kyllini harbour, W. Greece.
  • 2006 Submarine Outfall of Thriassion Plain, Attica, preliminary design.
  • 2007 Realignment of Metsovitikos River and protection works of Egnatia Highway, northern Greece.
    Expert report for the need of immediate repair of undertoe scouring in the deep quay of new Mykonos harbour.
  • 2008 Phaleron Marina: Layout optimisation , wave penetration and water quality issues- bid package.
    Port of Fujairah, northern Port Expansion Project, UAE: Final design of breakwater and embankments.
  • 2009 Coastal engineering study and development of a fishing harbour in St. Isidoros, Samos Island, Greece.
    Extension of Adamas Port in Milos Island to accommodate larger cruise-ships.
  • 2011 Expert Report on the Rehabilitation Study of Piraeus Container Terminal.
  • 2011-14 Coastal engineering study and harbour works in Hraio, and Ballos fishing harbours, Samos Island.
  • 2014 Coastal engineering study for a fishing boats shelter in St. Kyriaki, Chania, Greece.
  • 2015 Guidance and supervision of priority works for beach restoration on 4 damaged shores, Poros, Greece.
  • 2016 Flood studies for three major rivers in Western Greece.
  • 2017-18 Extension of Leipsi port, Greece.
  • 2018-19 Consulting services for the new commercial port of Paros.
    Consulting services for the restoration of Argostoli harbour.
  • 2019 Rehabilitation of a fishing boats refuge in eastern Peloponnese.
  • 2019-20 Final design for a commercial pier of Souda harbour.
  • 2020-21 Upgrading of Mathraki harbour, northern Ionian Sea.
  • 2021 Expansion of Mandraki harbour, Nisyros Island.
    Breakwater protection of electromechanical installations at Korakias shore, Crete, for the electricity interconnection of the island with the mainland.
  • 2022 Report on near seabed kinematics at Stachtoroi installations of the interconnection of Crete with Greek mainland electrical grid.
    Voudoros stream sea-outlet in NE Evia, Greece: arrangement works and coastal engineering study.
  • 2023 Design of new port installations in Patmos island, SE Aegean.
    Final design of a new marina in Leros island, Dodecanese, Greece.

Independent Expert Reports

  • On the failure of a gravity mooring dolphin in a pumice loading pier at Yali island, Dodecanese
  • Land transportation needs of the Piraeus Port
  • Conveyance of sea water from Patras Bay to the Messolonghi salt-ponds
  • Locating of a small port to serve a coastal development in eastern Peloponese
  • On the stream outlets into a protected coastal area in northwestern Peloponese
  • On the coastal erosion along southeastern Corinthian Gulf
  • On the repair timing of the damaged toe protection along the berths of the New Mykonos Port
  • On the structural upgrading of the Cosco container berths in Piraeus Port
  • Estimation of hydrodynamic actions on the electrode system supporting structures at both ends of the 2023 Crete-Attica power inter-connector -with J Roupas, for Prysmian Group