Publications

 

 

 

 

1

Marinelli M., Lambropoulos S., Petroutsatou K. (2014), "Earthmoving Trucks Condition Level Prediction using Neural Networks", Journal of Quality in Maintenance Engineering, Vol 20 (2), pp 182-192.

2

Petroutsatou C., Georgopoulos E., Lambropoulos S. and Pantouvakis J.P. (2012). “Early Cost Estimating of Road Tunnel Construction Using Neural Networks”, Journal of Construction Engineering and Management, American Society of Civil Engineers (ASCE), 138 (6), pp. 679-687.

3

Petroutsatou, C. and Lambropoulos, S. (2009).Road tunnels construction cost estimation: a structural equation model development and comparison”, Operational Research: An International Journal, 10 (2), pp. 163-173.

4

Petroutsatou, C., Lambropoulos, S. and Kavvadas, M. (2009).Road tunneling in variable ground in Greece: Design practices, construction methods and cost estimates”, International Journal of Engineering and Management, 1 (2), pp. 123-135.

5

Petroutsatou, C. and Lambropoulos, S. (2007). “Pre-estimation of Road Tunnel Construction Cost”, Tech. Chron. Sci. J. TCG, I, No 1-2, pp.99-110.(in greek)

6

Marinos V., Korkaris K., Prountzopoulos G., Romosiou N., Fortzakis M., Mirmiris K., Petroutsatou C., Koumoutsakos D., Kiamos K., Lazaridou S., Pitsas G., Rigopoulou M., Marinos P., Lambropoulos S. (2006). “The development of a geotechnical tunnel data base for the Egnatia Odos S.A.”. Proceedings of the 5th Geotechnical Conference, Xanthi, Greece, TCG, pp 7. (in greek)

7

Petroutsatou C., Lambropoulos S. (2005). “Fast estimation of road tunnels cost”, 2nd Hellenic highway Engineering Conference, ΤCG, 70 (087), p. 7, Volos, Greece. (in greek)