Publications

 

 

 

 

1

Kallantzis A., Soldatos J., Lambropoulos S. (2007). “Linear versus Network Scheduling: A Critical Path Comparison”, Journal of Construction Engineering and Management, American Society of Civil Engineers (ASCE), 133 (7), pp. 483–491.

2

Kallantzis A., Lambropoulos S. (2005). “Linear Project Acceleration without Increasing Production Rates”, Tech. Chron. Sci. J.TCG, É, Íï 1, 53-63.

3

Maravas A., Kallantzis A., Lambropoulos S. (2005). “The Application of OLAP Technology in Monitoring Construction Cost”, 3rd International Conference on Construction in the 21st Century (CITC – III), “Advancing Engineering, Management and Technology”, 724 - 728, Athens.

4

Lambropoulos S., Kallantzis A., Maravas A. (2005) “Information System application for the cost and time management of the Egnatia Motorway”, 2nd Highway Engineering Conference, ÔCG, 37 (055), pp. 8, Volos, Greece. (in greek).

5

Kallantzis A., Lambropoulos S. (2004) “Correspondence of Activity Relationships and Critical Path between Time - Location Diagrams and CPM”, Operational Research: An International Journal, Volume 4, Issue 3, pp 277 – 290.

6

Êallantzis Á., Lambropoulos S. (2004) “Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling”, Engineering Construction and Architectural Management, Vol. 11, No 3, pp 211 – 222.

7

Êallantzis Á., Lambropoulos S. (2004) Discussion of the paper “Comparison of Linear Scheduling Model and Repetitive Scheduling Method” by K. Mattila and A. Park, Journal of Construction Engineering and Management, ÁSCE, pp. 463 – 467.

8

Êallantzis Á., Lambropoulos S. (2003) “Evaluation of Critical Path Methods For Linear Projects“, 2nd International Conference on Construction in the 21st Century (CITC-II) “Sustainability and Innovation in Management and Technology”, 426 – 431, Hong Kong.